Monsoon to freeze: what a Prescott building actually goes through.

Two seasons do most of the damage up here, and they work together. The order they happen in is the reason October is the month that matters.

A building in Prescott gets tested twice a year, and the two tests are connected. First the monsoon soaks it. Then winter freezes what the monsoon left behind. Neither one alone would do much. Together they are the reason old stucco spalls, mortar crumbles and paint lets go.

The monsoon

The National Weather Service defines Arizona’s monsoon as June 15 through September 30, and calls it the most dangerous time of year weather-wise in the state. For a building the hazard is not drama, it is volume and direction: a large share of the year’s rain arrives in two months, often driven sideways by thunderstorm winds.

Per the Arizona State Climate Office, using NOAA 1991–2020 normals, Prescott averages about 12.9 inches of precipitation a year — and July and August together account for roughly a third of it. Rain that arrives that fast finds every open joint, failed sealant and blocked scupper you have.

Then the freeze

Prescott sits at about 5,200 feet and runs roughly 120 to 130 nights a year at or below freezing on current NOAA normals. What that does to a wet wall is mechanical, and the NIH Office of Research Facilities describes it plainly:

Freeze-thaw damage occurs when water fills the voids of a rigid, porous material and then freezes and expands. The volume of frozen water is 9% greater than liquid water, so when water freezes pressure is exerted on the surrounding material, and when the pressure exceeds the tensile strength of the material, cracks will result.

NIH Office of Research Facilities, Technical Bulletin 84, January 2019

Two failure modes follow. Surface spalling, where the outer layer fractures to the depth the water reached and falls away — that is the flaking you can see. And internal cracking, which as the same bulletin notes “starts on the interior, which may not be evident to visual inspection.” The damage you can see is the smaller half.

This is why October beats spring. Freeze damage needs water already in the wall. Close the ways in before the freezing starts and the freeze has far less to work with. Doing it in spring means inspecting damage that has already happened.

When to look at what

Rather than invent a schedule, the sensible starting point is the inspection frequency chart published by the National Park Service in Preservation Brief 47, which is written for exactly this — keeping the exterior of a modest building sound. Its guidance:

Inspection frequency

FeatureHow oftenWhen
RoofAnnuallySpring and fall; by a roofer every five years
ChimneysAnnuallyFall, before heating season
Roof drainageEvery six monthsBefore and after the wet season
Exterior wallsAnnuallySpring, before painting season
WindowsAnnuallySpring, before painting season
Foundation and gradeAnnuallySpring, or the wet season
DoorsEvery six monthsSpring and fall

The same brief adds that everything should be checked after any significant weather event — a severe storm or unusually high winds. In Prescott, “before and after the wet season” means roughly May and October.

The May list

Before the monsoon, the job is to make sure water that lands on the building leaves it:

Clear gutters, scuppers and downspouts and flush them through. Check that gutters still fall toward the drains and do not pond. Look at roof-to-wall junctions, parapet caps and flashings. Check sealant joints at windows, doors and any penetration — pipes, vents, conduit, light fixtures. Confirm grade still slopes away from the building.

The October list

After the monsoon and before the freeze, the job is to close what the summer opened:

Re-check the drainage you cleared in May, because monsoon debris is exactly what blocks it. Seal open cracks in stucco and masonry. Replace failed caulking at trim, corners and penetrations. Repair damaged siding, fascia and eaves. Look for staining or streaking below gutters and valleys, which marks where water has been running where it should not.

One scheduling constraint worth knowing. The National Park Service notes that repointing masonry wants wall temperatures between 40 and 95°F to avoid freezing or flash evaporation. In Prescott that rules out a good part of the winter, which is another argument for getting masonry work done in autumn rather than putting it off.

Where this comes from

Everything above traces to one of these. Where a figure could not be traced to a primary source, we left it out rather than repeat it.

  1. National Weather Service, Tucson — Monsoon Safety: “June 15th through September 30th has been defined as ‘The Monsoon’.”
  2. Arizona State Climate Office, Arizona State University — Prescott station climate summary, normals 1991–2020, from NOAA Regional Climate Centers data.
  3. NIH Office of Research Facilities, Technical Bulletin, Issue 84: The Freeze-Thaw Cycle in Concrete and Brick Assemblies, January 2019.
  4. National Park Service, Preservation Brief 47: Maintaining the Exterior of Small and Medium Size Historic Buildings, Sharon C. Park FAIA — inspection frequency chart and gutter guidance.
  5. National Park Service, Preservation Brief 2: Repointing Mortar Joints in Historic Masonry Buildings, Mack and Speweik, 1998 — working temperature range.

Tell us what needs doing

Call or email with what you've got — big remodel or a Saturday-sized repair list.

On the job Monday–Friday, 7am–5pm · office 9am–5pm
Emergency work — call any time.

Licensed · Bonded · Insured · AZ ROC #327959 (CR-61)